Featherstone Prison, Wolverhampton

Donegan Civil Engineering were appointed by Kier Construction to undertake this specialist subcontract which included the design, build and installation of an underground pumping station on the extension works to HMP Featherstone.

Details

Client: Kier Construction

Services Provided

Segmental Shaft Sinking

Reinforced Concrete Structures

Featherstone Prison, Wolverhampton
Featherstone Prison
Featherstone Prison

Scope of Works at Featherstone Prison

  • A 9.00m internal diameter shaft was sank by caisson method to a depth of approx 10m in sands, gravels and founded in very weak sandstone.
  • Surrounding structures included a Valve Chamber, Flow Control Chamber, Isolation Penstock Chamber and Macerator Chamber. Along with these structures there was also the interconnecting pipework, ductile iron backdrop pipework and rising main pipework.

The M&E works included 3 variable speed submersible pumps, rising main pipework, isolating penstock for maintenance purposes, a macerator channel grinder for breaking up solids and all electronic control equipment.

Other Projects

Mancunian Way, Manchester

Balfour Beatty / United Utilities

Segmental Shaft Sinking

Dewar Place Cable Tunnel

Edinburgh

Segmental Shaft Sinking

New Victoria, Manchester

For Vinci

General Civil Engineering

Contact Us

Contact us for more information about this project or for estimation on your projects