Case Study
Ditton Road, Widnes
Particular challenges included tunnelling through contaminated ground with Hydrogen Sulphide present. For this operation, the underground personnel wore hooded masks with an air supply fed continuously to them from the surface.
Details
Client: United Utilities
Value: £4,800,000
Services Provided



Scope of Works for Ditton Road, Widnes
- Diversion of a 2300mm dia. sewer whilst maintaining flows, required to facilitate the construction of the new Mersey Gateway Bridge.
- Construction of 4 no. segmental shafts, 6.00 & 7.50m dia.
- Completion works to above, including reinforced concrete bases, benching, backdrops and precast concrete roof slabs.
- Abandonment of existing sewers up to 2300mm dia.
- Construction of a 2100mm dia. tunnel approx. 460m in length, by Pipejacking techniques, using a Backacter Tunnelling Machine.
Other Projects
Mancunian Way, Manchester
Balfour Beatty / United Utilities
Segmental Shaft Sinking
Dewar Place Cable Tunnel
Edinburgh
Segmental Shaft Sinking
New Victoria, Manchester
For Vinci
General Civil Engineering
Contact Us
Contact us for more information about this project or for estimation on your projects