Case Study

Clifton WwTW, Penrith, Cumbria – Rail Crossing

Donegan Civil Engineering undertook this specialist tunnelling sub-contract for Daniel Contractors on a United Utilities scheme.

Details

Client: Daniel Contractors / United Utilities

Services Provided

Tunnelling and Pipejacking

Clifton WWTW
Clifton WWTW
Clifton WWTW

Scope of Works for Clifton WwTW

  • the construction of the new Hackthorpe pumping station which was a 6.00m diameter segmental shaft underpinned in hard sandstone to approx 10m depth.
  • After this a 6.00m diameter drive shaft and a 4.00m reception shaft, both approx 8m deep, were constructed on either side of one of the countries busiest railway lines the West Coast Mainline.
  • On completion of the shafts a 1500mm internal diameter pipejack approx 40m length was carried out beneath the railway line using an open-face backacter through boulder clay.

During the crossing Donegan operatives double shifted the drive and track level monitoring was carried out by Network Rail.

Other Projects

Mancunian Way, Manchester

Balfour Beatty / United Utilities

Segmental Shaft Sinking

Dewar Place Cable Tunnel

Edinburgh

Segmental Shaft Sinking

New Victoria, Manchester

For Vinci

General Civil Engineering

Contact Us

Contact us for more information about this project or for estimation on your projects