Case Study

Arnold Close, Dukinfield

This project was undertaken direct for United Utilities to take 4 local properties off the flood register.

Details

Client: United Utilities

Services Provided

Segmental Shaft Sinking

Open-Cut Drainage

Reinforced Concrete Structures

Arnold Close, Dukinfield
Arnold Close Dukinfield
Arnold Close, Dukinsfield

Scope of Works at Arnold Close, Dukinfield

  • Donegan constructed a 10.30m shaft approx 6m deep to act as a surface water detention tank within the local golf course.
  • There was also approx 550m of both surface and foul water sewers to be upsized, ranging from 225mm upto 1200mm diameter, constructed online down small residential roads.
  • There was also a 450mm diameter augerbore approx 30m length under the entrance to the golf course club house to reduce any disruption.
  • To prevent disruption to the local residents and primary school during construction the working area was kept to a minimum as it progressed up Tennyson Avenue.

Other Projects

Mancunian Way, Manchester

Balfour Beatty / United Utilities

Segmental Shaft Sinking

Dewar Place Cable Tunnel

Edinburgh

Segmental Shaft Sinking

New Victoria, Manchester

For Vinci

General Civil Engineering

Contact Us

Contact us for more information about this project or for estimation on your projects