Case Study
Upperpassmonds Road, Rochdale
This project was carried out on behalf of Balfour Beatty, for United Utilities.
It involved the caisson sinking of a 10.30m internal diameter segmental shaft approx 15m deep through wet sandy clays.
Scope of Works at Upperpassmonds Road, Rochdale
- It involved the caisson sinking of a 10.30m internal diameter segmental shaft approx 15m deep through wet sandy clays.
- A 762mm diameter steel pipe installed by augerbore approx 30m length was used to connect the shaft to the existing sewer network.
- A timber heading approx 20m length was then undertaken to install a section of the rising main with the remaining 30m completed in opencut.
- There was also 170m of 600mm diameter concrete pipes installed along the adjacent road as on-line replacement of the existing combined sewer, which also involved constructing 8 new manhole chambers.
- Finally the compound area was reinstated and converted back into a car park, which involved reconstructing a stone wall, kerbing and macadam surfacing.
Other Projects
Fujiclean Tank Installation
South Cheshire
General Civil Engineering
Witton Park, Blackburn
United Utilities
Tunnelling and Pipejacking
New Victoria, Manchester
For Vinci
General Civil Engineering
Contact Us