Case Study

Courtaulds Sewer, Preston

The aim of the works were to fix part of the damaged existing foul sewer which was flowing into the River Ribble after the bank had collapsed.

Details

Client: Balfour Beatty / United Utilities

Services Provided

General Civil Engineering

Open-Cut Drainage

Sheet Piling

Courtaulds Sewer, Preston
Courtaulds Sewer, Preston
Courtaulds Sewer, Preston

Scope of Works at Courtaulds Sewer, Preston

  • It involved the stabilisation of a bank on one side of the River Ribble with over 400m of pre-driven permanent steel sheet piling
  • Re-construction of over 400m of the sewer system
  • New cycle track / pedestrian walkway.