This project was carried out on behalf of Mott MacDonald-Bentleys, for Yorkshire Water.
The Contract included the construction of a 20.00m diameter segmental shaft approx 23m deep.
Details
Client: Mott MacDonald-Bentleys – Yorkshire Water
Value: £1,925,000
Services Provided
Scope of Works
- Construction of 20.00m dia. segmental shaft 23.00m deep.
- Completion works to above, including reinforced concrete base, benching, 1200mm dia. backdrop pipe, and 20.00m dia. precast concrete roof slab.
- Construction of an 1800mm dia. tunnel approx. 130m in length, by Pipejacking techniques, using a Backacter Tunnelling Machine.