Current Contracts
 
UPPERPASSMONDS ROAD, ROCHDALE
 
The scheme is being carried out on behalf of Balfour Beatty, for United Utilities.
 
It involves the sinking of a 10.30m diameter segmental shaft, together with approximately 200m of pipework and associated manholes within the highway. The scheme also includes some 50m of augerboring.
 
Upperpassmonds Road Rochdale
Upperpassmonds Road Rochdale
 
 
BRUNSWICK ROAD, ALTRINCHAM
 
This £1.5M project is being carried out for a major client of ours, Balfour Beatty, on behalf of United Utilities. The project is a flood prevention contract, and the photographs show the construction of a 15.00m diameter shaft which will act as a storage tank in times of heavy rainfall.
 
You will note that the upper part of the shaft is supported by pre-driven steel sheet piles. This method was employed due to the anticipated unstable ground conditions within the top 9.00m depth of the shaft.
 
Brunswick Road Altrincham
Brunswick Road Altrincham
 
 
DARWEN UID
 
This £3.5M project is being carried out direct for United Utilities. The photographs show the construction of a 15.00m diameter shaft which will act as a detention tank. Closer inspection will identify piled pit excavations, within which reinforced concrete structures and chambers are being constructed. A reinforced concrete "outfall structure" has also been built within the embankment of the river.
 
Darwen UID
Darwen UID
Darwen UID
 
 
COURTAULDS SEWER, PRESTON
 
Current project underway in Preston.
 
Courtaulds Sewer, Preston
Courtaulds Sewer, Preston
 
For more information on this development please contact us by clicking here. Alternatively you can ring us on 0161 495 7300.
 


Home | Services | Current Contracts | Recent Contracts | Accreditations | About Us | Contact Us

©Copyright 2006 Donegan
Created and maintained by WSI
This site is optimized for Netscape 4.0  and Internet Explorer 5.0 or higher. Please download an updated version.