UPPERPASSMONDS ROAD, ROCHDALE
The scheme is being carried out on behalf of Balfour Beatty, for United Utilities.
It involves the sinking of a 10.30m diameter segmental shaft, together with approximately 200m of pipework and associated manholes within the highway. The scheme also includes some 50m of augerboring.
BRUNSWICK ROAD, ALTRINCHAM
This £1.5M project is being carried out for a major client of ours, Balfour Beatty, on behalf of United Utilities. The project is a flood prevention contract, and the photographs show the construction of a 15.00m diameter shaft which will act as a storage tank in times of heavy rainfall.
You will note that the upper part of the shaft is supported by pre-driven steel sheet piles. This method was employed due to the anticipated unstable ground conditions within the top 9.00m depth of the shaft.
DARWEN UID
This £3.5M project is being carried out direct for United Utilities. The photographs show the construction of a 15.00m diameter shaft which will act as a detention tank. Closer inspection will identify piled pit excavations, within which reinforced concrete structures and chambers are being constructed. A reinforced concrete "outfall structure" has also been built within the embankment of the river.
COURTAULDS SEWER, PRESTON
Current project underway in Preston.
For more information on this development please contact us by clicking here. Alternatively you can ring us on 0161 495 7300.
|